A firm is considering a proposal to set up a cement manufacturing plant with an initial investment of 150 crore. The firm has the option to abandon…
CA Final · Advanced Financial Management · PYQS · November 2024
A firm is considering a proposal to set up a cement manufacturing plant with an initial investment of 150 crore. The firm has the option to abandon the project after one year by selling it to a competitor for 100 crore if the market conditions are unfavorable and the demand is low, the project's value will decline by 60%. However, if the market conditions turn out to be favorable and the demand for cement is high, the value of the project at the end of year 1 will increase by 50%. Given that the risk free rate of interest as 8%, what will be the value of the abandonment option and the value of the project with abandonment option?
Suggested Answer and Working Notes:
Decision Tree showing pay off Year 0 Year 1 Option Pay off 225 0 -150 60 100 - 60 = 40 First of all, we shall calculate probability of high demand (p) using risk neutral method as follows: 8% = p x 50% + (1-p) x (-60%) 0.08 = 0.50 p - 0.60 + 0.60p p = 0.68/1.10 = 0.618 or 0.62 The value of abandonment option will be as follows: Expected Payoff at Year 1 = p x 0 + [(1-p) x 40] = 0.618 x 0 + [0.382 x 40] = 15.28 crore Since expected pay off at year 1 is 15.28 crore. Present value of expected pay off will be: = 15.28 / 1.08 = 14.15 crore Thus, the value of abandonment option is 14.15 crore. Value of Project with abandonment option - (i) If PVF is not considered Expected Value of the Project without abandonment option = (0.618 x 225 crore + 0.382 x 60 crore) – 150crore = 11.97 crore Value of Project with abandonment Option = 11.97 crore +14.15 crore = 26.12 crore Or Expected Value of the Project without abandonment option = (0.62 x 225 crore + 0.38 x 60 crore) – 150 crore = 12.30 crore Value of Project with abandonment Option = 12.30 crore +14.15 crore = 26.45 crore (ii) If PVF is considered Expected Value of the Project without abandonment option = (0.618 x 225 crore + 0.382 x 60 crore)/1.08 – 150 crore = -0.028 crore OR -0.03 Value of Project with abandonment Option = -0.028 crore + 14.15 crore = 14.122 crore OR 14.12 crore Or Expected Value of the Project without abandonment option = (0.62 x 225 crore + 0.38 x 60 crore)/1.08 – 150 crore = 0.28 crore Value of Project with abandonment Option = 0.28 crore + 14.15 crore = 14.43 crore
Topics: Advanced Capital Budgeting Decisions
Related Questions in this Topic
- ABC Ltd. operates a fleet of cabs. One of its lot of cabs has completed its useful life of 10 years and has been fully d...
- Alpha Green Energy Ltd. (AGEL), a listed company engaged in manufacturing renewable energy equipment, is evaluating the ...
- KLM Ltd., is considering taking up one of the two projects-Project-A and Project-B. Both the projects having same life r...
- Tension Free Solutions (TFS) is a reputed is logistic service providers. All the deliveries are made by drivers of the m...
- D and Co.is a company which installs pipes for supply of oxygen in the hospitals as per their specifications. It is plan...