EXPLAIN the difference between Bill of Materials and Material Requisition Note.
CA Intermediate · Cost and Management Accounting · MTP · May 2025
EXPLAIN the difference between Bill of Materials and Material Requisition Note.
Suggested Answer and Working Notes:
Difference between Bill of Materials and Material Requisition Note Bill of Materials Material Requisition Note 1. It is the document prepared by the engineering or planning dept. 1. It is prepared by the production or other consuming department. 2. It is a complete schedule of component parts and raw materials required for a particular job or work order. 2. It is a document asking Store-keeper to issue materials to the consuming department. 3. It often serves the purpose of a material requisition as it shows the complete schedule of materials required for a particular job i.e. it can replace material requisition. 3. It cannot replace a bill of materials. 4. It can be used for the purpose of quotations. 4. It is useful in arriving historical cost only. 5. It helps in keeping a quantitative control on materials drawn through material requisition. 5. It shows the material actually drawn from stores.
Topics: Material Cost
Related Questions in this Topic
- M/s Esha Materials Private Limited produces a product which names "ESS". The consumption of raw material for the product...
- Vaibhav Industries Ltd. uses chemical-A in one of its finished products. The chemical-A is purchased from a vendor outsi...
- Himalayan Bakers Pvt. Ltd., a mid-sized bakery chain headquartered in Dehradun, produces its signature product "Multigra...
- Aarav Industrial Resins Pvt. Ltd., headquartered in Ghaziabad, is engaged in manufacturing specialty chemicals used in t...
- Hari Udyog is a small-scale manufacturing unit producing a single product X using two raw materials PK and BK in the inp...