Following information is extracted from the purchase department of A Ltd.: (i) Number of units to be purchased during the year is 10,000 (ii) Cost…
CA Intermediate · Cost and Management Accounting · MTP · January 2025
Following information is extracted from the purchase department of A Ltd.: (i) Number of units to be purchased during the year is 10,000 (ii) Cost of placing a purchase order is 40 (iii) Purchase price per unit is 80 (iv) Insurance charges to be paid for protecting goods during transit is 20 per unit (v) Cash discount to be received is 2% (vi) Annual cost of storage per unit is 5 (vii) Details of lead time: Average- 20 daysMaximum- 30 daysMinimum- 10 daysFor emergency purchases- 8 days. (viii) Rate of consumption: Average- 30 units per dayMaximum- 40 units per day. From the information given above, you are required to CALCULATE: (i) Re-ordering level (ii) Maximum level (iii) Minimum level (iv) Danger level.
Suggested Answer and Working Notes:
Basic Data: A (Number of units to be purchased annually) = 10,000 units O (Ordering cost per order) = 40 C (Annual cost of storage per unit) = 5 Purchase price per unit = 80 +20 (Insurance charges) = 100 (Note: Cash discount is treated as an interest and finance item and thus, it is ignored.) Computations: (i) Re-ordering level (ROL) = Maximum usage per period × Maximum lead time = 40 units per day × 30 days = 1,200 units (ii) Maximum level = ROL + ROQ – [Min. rate of consumption × Min. lead time] (Refer to working notes 1 and 2) = 1200 units + 400 units – [20 units per day × 10 days] = 1,400 units (iii) Minimum level = ROL – [Average rate of consumption x Average re-order-period] = 1,200 units – (30 units per day × 20 days) = 600 units (iv) Danger level = Average consumption × Lead time for emergency purchases = 30 units per day × 8 days = 240 units Working Notes: 1. Minimum rate of consumption per day (X) Average rate of consumption = (Minimum rate of consumption + Maximum rate of consumption) / 2 30 units per day = (X units/day + 40 units per day) / 2 Or, X = 20 units per day. 2. Re-order Quantity (ROQ) or Economic Order Quantity (EOQ) = √(2 × 10,000 units × ₹ 40) /5 = 400 units
Topics: Material Cost
Related Questions in this Topic
- M/s Esha Materials Private Limited produces a product which names "ESS". The consumption of raw material for the product...
- Vaibhav Industries Ltd. uses chemical-A in one of its finished products. The chemical-A is purchased from a vendor outsi...
- Himalayan Bakers Pvt. Ltd., a mid-sized bakery chain headquartered in Dehradun, produces its signature product "Multigra...
- Aarav Industrial Resins Pvt. Ltd., headquartered in Ghaziabad, is engaged in manufacturing specialty chemicals used in t...
- Hari Udyog is a small-scale manufacturing unit producing a single product X using two raw materials PK and BK in the inp...